
Prefab Construction Design Steel Structure Warehouse
- Delivery Time:
- 15 Days
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | China (Mainland) |
---|
1 Easy installation&disassemble
2 Low cost
3 Fashion
4 Certificate:CE
Prefab Construction Design Steel Structure Warehouse
Product Description: Prefab Warehouse Main Components
Column,Girder | H section steel |
Purlin | C or Z section steel |
Brace | cross support, angle brace, brace between purlin/column/beam |
Bolt | anchor,ordinary,high strenght bolt |
Roof &Wall | sandwich panel or profiled steel sheet |
Sandwich panel materials | EPS, polyurethane, rock wool, glass wool |
Window | PVC or aluminum alloy door |
Door | sliding or rolling door |


Company Name | Shijiazhuang Changhang Corporation |
Main Product | Steel Structure,Space Frame,Prefabricated House,Steel Sheet, Sandwich Panel, etc. |
Production Lines | 1. Production lines of light steel,heavy steel,space frame and tube truss. 2. Production lines of color steel plate,curtain wall and other envelope structures. 3. Production lines of metal building materials, like purlins, screws. |
Equipment | CNC pipe cutting machine, CNC hydrauic shearing machine, Hydraulic sheet metal blending machine, Gantry submerged arc welding machine, Corrugated sheet molding machine, Shot blasting machine, Punching machine,Drilling Machine, Forging machine, H-section assembly machine,Straightener etc. |
Lead Time | 15-30 days |
Payment Terms | T/T or L/C |




1. total free design and quotation as your need | |
2. quotation according to your own drawings | |
3. full set of detailed installation drawings supplied |

Related Keywords