Hebei Longway Petroleum Equipment Co., Ltd.
Hebei Longway Petroleum Equipment Co., Ltd.
5'' inch S135 R2 API 5DP Drill Pipe - LONGWAY FACTORY
  • 5'' inch S135 R2 API 5DP Drill Pipe - LONGWAY FACTORY
5'' inch S135 R2 API 5DP Drill Pipe - LONGWAY FACTORY

5'' inch S135 R2 API 5DP Drill Pipe - LONGWAY FACTORY

Delivery Time:
30 Days
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: Hebei, China (Mainland)
Product Description
Product Description
5" S135 Drill pipe# ALIBABA Hot Selling  From Longway     4.5" E75 Drill pipe# ALIBABA Hot Selling  From Longway 1. OD: 5'' inch/ 127mm 2. Thickness: 9.19mm  (19.5 LB/FT ) 3. Tool joint: NC50 4. Steel grade: S135 5. Length: 9.5 M   Alternative: Internal plastic coating: TC2000, TK34 Hardbanding: Arnco 100XT,  Arnco  300XT, LONGWAY   Features:
1. Strictly according to API 5DP standard 
2. Yield strength: Min 931Mpa
3. Tensile strength: Min 1000Mpa
4. Pipe body material: High quality alloy seamless pipe of S135
5. Tool joint: 4137H
6. Thread treatment: Phosphorization or copper plating
7. Suitable for gas well, oil well
8. Safe drilling depth: Within 4,000 meters
Certification:
1. ISO 9001: 2008
2. API 5DP-0011 3. GOST No.: 1739641

Packing detail: 1. The drill pipes will be packed into bundles as 3x3, 3x4, 4x4 etc. and loading into containers after black painting and thread protectors installation. 2. For 20’ container, the max loading weight is 21 metric tons 3. For 40’ container, the max loading weight is 27 metric tons 4. Usual loading port is Xingang port in Tianjin, main port in north of China   Drill pipe quality control: a) Before order to be confirmed, the raw material of pipe body and tool joint should be booked from famous big steel enterprises in China b) Raw material’s size, quantity, length, mechanical property are checked by our QC staff and factory own laboratory c) Every drill pipe has nondestructive inspection , cleaned and thread oil before packing. d) Before delivery clients could send one QC or point the third party to check the quality such SGS, BV or others   Drill pipe usage notes: 1. New drill pipe should be pasted thread oil before connection 2. Make up and break at least 3 times before drilling 3. Hard bending and plastic coating can be processed according to clients’ special requirements *Longway is professional production of drilling tools,  if you want to know more about our products, pls feel free to contact us.   *Betty at your service in 24 hours Skype:lwdrillsales6 Mobile: +86-18633912255 ------------------------------------------------------------------------ Longway's best quality drill pipe of API standard

Send your message to this supplier

  • Mr. Eric Niu

  • Enter between 20 to 4,000 characters.