
2-3/8''(60.32mm) E75 drill pipe for water well
Quantity:
Your message must be between 20 to 2000 characters
Contact NowBasic Info
Basic Info
Place of Origin: | Hebei, China (Mainland) |
---|
Product Description
Product Description
Supply API5DP drill pipe-- Our products range--- API 5DP oil drill pipe water well drill pipe coalbed gas drill pipe shale gas drill pipe geolagical drill pipe drill collar/lelly heavy weight drill pipe
2-3/8" E75 water well Drill Pipe 1. OD: 2 3/8”(60 mm) 2. Steel grade: E75 3.Thickness: 7.11mm( 6.65 LB/FT ) 4. Length:RI,RII,RIII (2-12.5 meters) 5. Thread type:NC26 6.Thread treatment:Phosphorization, copper plating 7. Plastic coating:TC2000, TK34,TK34P 8. Hardbending:Boton, Arnco, TCS Ti, ARMACOR-M, Hughes Super smooth x,Duraband Features:
1. Strictly according to API 5DP standard
2. Yield strength: Min 517 Mpa
3. Tensile strength: Min 724 Mpa
4. Pipe body material: High quality alloy seamless pipe of E75
5. Tool joint: 35CrMo, 4137H
6. Thread treatment: Phosphorization or copper plating
7. Suitable for water well, geothermal well, gas well, oil well
8. Safe drilling depth: Within 1600 meters Certification:
1. ISO 9001: 2008
2. API 5DP-0011 3. GOST No.: 1739641 Packing detail: 1. The drill pipes will be packed into bundles as 3x4/4x4. and loading into containers after black painting and thread protectors installation. 2. For 20’ container, the max loading weight is 21 metric tons 3. For 40’ container, the max loading weight is 27 metric tons 4. Usual loading port is Xingang port in Tianjin, main port in north of China Drill pipe quality control: a) Before order to be confirmed, the raw material of pipe body and tool joint should be booked from famous big steel enterprises in China b) Raw material’s size, quantity, length, mechanical property are checked by our QC staff and factory own laboratory c) Every drill pipe has nondestructive inspection , cleaned and thread oil before packing. d) Before delivery clients could send one QC or point the third party to check the quality such SGS, BV or others Drill pipe usage notes: 1. New drill pipe should be pasted thread oil before connection 2. Make up and break at least 3 times before drilling 3. Hard bending and plastic coating can be processed according to clients’ special requirements
1.Pipe body process
2. Tool joint process
3.Friciton welding
4.QC
*Longway is professional production of drilling tools, if you want to know more about our products, pls feel free to contact us. Contact: Sophia Zhao Skype:lwdrillsales14 *Service the oil fields all over the world. ------------------------------------------------------------------------ Longway's best quality drill pipe of API standard




1. Strictly according to API 5DP standard
2. Yield strength: Min 517 Mpa
3. Tensile strength: Min 724 Mpa
4. Pipe body material: High quality alloy seamless pipe of E75
5. Tool joint: 35CrMo, 4137H
6. Thread treatment: Phosphorization or copper plating
7. Suitable for water well, geothermal well, gas well, oil well
8. Safe drilling depth: Within 1600 meters Certification:
1. ISO 9001: 2008
2. API 5DP-0011 3. GOST No.: 1739641 Packing detail: 1. The drill pipes will be packed into bundles as 3x4/4x4. and loading into containers after black painting and thread protectors installation. 2. For 20’ container, the max loading weight is 21 metric tons 3. For 40’ container, the max loading weight is 27 metric tons 4. Usual loading port is Xingang port in Tianjin, main port in north of China Drill pipe quality control: a) Before order to be confirmed, the raw material of pipe body and tool joint should be booked from famous big steel enterprises in China b) Raw material’s size, quantity, length, mechanical property are checked by our QC staff and factory own laboratory c) Every drill pipe has nondestructive inspection , cleaned and thread oil before packing. d) Before delivery clients could send one QC or point the third party to check the quality such SGS, BV or others Drill pipe usage notes: 1. New drill pipe should be pasted thread oil before connection 2. Make up and break at least 3 times before drilling 3. Hard bending and plastic coating can be processed according to clients’ special requirements








Related Keywords
Related Keywords