
stub end flange
- Delivery Time:
- 7 Days
Quantity:
Your message must be between 20 to 2000 characters
Contact NowBasic Info
Basic Info
Place of Origin: | China (Mainland) |
---|
Product Description
Product Description
Specifications Type:Stub End
Size:1/2"-48"
Material:AS,CS,SS
WT:Sch5-Sch160,XS,XXS,STD
Payment:L/C,T/T
Carbon Steel Pipe Stub End 1)Type: Stub End 2)Material:AS,CS,SS 3)Standard:ASME,JIS,DIN,GB 4)Face:RF,FF,MFM,RJ,TG,RTJ,SRF 5Pressure:Class150lb,300lb,600lb,900lb,1500lb,2500lb PN6,PN10,PN16,PN20,PN25,PN40 6)Wall Thickness:Sch5,Sch10,Sch20,Sch30,Sch40,Sch60,XS,Sch120,Sch160,XXS,STD 7)Standard:ASME B16.9,ASME B16.25, ASME B16.28,MSS SP75 DIN2605 JIS B2311 8)Surface Treatment:Hot Galvanized or Transparent Oil or Black etc. 9)Packing:In wooden cases or pallet or according to customers requirement 10)Payment:L/C,T/T 11)Delivery Time:7-20 days depend on product quantity 12)Certification:ISO9001:2000,ISO9001:2008,ISO/TS16949 13)Application:Petroleum,Chemical,Election Power,Oil&Gas,Shipbuilding,Water-treatment,etc. 14)Export:Europe,North American,the Middle East,Africa,Asia and other countries and regions 15The third party inspection:SGS and other party alloyed by clients 16)Others:1.Special design available according to customers' requirements. 2.Anti-corrosion and high temperature resistant with black painting. 3.All the production process are made under ISO9001:2000 strictly. Drawing of stube end
If you are interested in our products,please kindly contact.
Size:1/2"-48"
Material:AS,CS,SS
WT:Sch5-Sch160,XS,XXS,STD
Payment:L/C,T/T
Carbon Steel Pipe Stub End 1)Type: Stub End 2)Material:AS,CS,SS 3)Standard:ASME,JIS,DIN,GB 4)Face:RF,FF,MFM,RJ,TG,RTJ,SRF 5Pressure:Class150lb,300lb,600lb,900lb,1500lb,2500lb PN6,PN10,PN16,PN20,PN25,PN40 6)Wall Thickness:Sch5,Sch10,Sch20,Sch30,Sch40,Sch60,XS,Sch120,Sch160,XXS,STD 7)Standard:ASME B16.9,ASME B16.25, ASME B16.28,MSS SP75 DIN2605 JIS B2311 8)Surface Treatment:Hot Galvanized or Transparent Oil or Black etc. 9)Packing:In wooden cases or pallet or according to customers requirement 10)Payment:L/C,T/T 11)Delivery Time:7-20 days depend on product quantity 12)Certification:ISO9001:2000,ISO9001:2008,ISO/TS16949 13)Application:Petroleum,Chemical,Election Power,Oil&Gas,Shipbuilding,Water-treatment,etc. 14)Export:Europe,North American,the Middle East,Africa,Asia and other countries and regions 15The third party inspection:SGS and other party alloyed by clients 16)Others:1.Special design available according to customers' requirements. 2.Anti-corrosion and high temperature resistant with black painting. 3.All the production process are made under ISO9001:2000 strictly. Drawing of stube end



Related Keywords
Related Keywords