
carbo steel butt welded stub ends
-
USD0.3≥1 Bag/Bags
- Payment Type:
- L/C, T/T, D/P, Paypal, Western Union
- Incoterm:
- FOB, CFR, CIF, FCA
- Min. Order:
- 1 Bag/Bags
- Min. Order:
- 1 Bag/Bags
- Delivery Time:
- 25 Days
- Transportation:
- Ocean, Land, Air
- Port:
- Tianjin Port
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | China |
---|---|
Productivity: | 1000 Pieces per Week |
Supply Ability: | 2000 Metric Ton per Month |
Payment Type: | L/C,T/T,D/P,Paypal,Western Union |
Incoterm: | FOB,CFR,CIF,FCA |
Certificate: | ISO 9001 |
Transportation: | Ocean,Land,Air |
Port: | Tianjin Port |
Carbon Steel Stub Ends are manufactured in all standard wall thicknesses,Stub end suit for lap joint flange.
stub end welded with pipe.
Product name:carbo steel butt welded stub ends
Steel Stub End Size:1/2"-60"
butt welded stub ends Material:A234WPB,A420WPL6 ST37 SS316/SS316L SS304/SS304L DUPLEX
carbo steel stub ends Thickness:STD SCH20 SCH40 SCH80 SCH160 XS XXS SCH5S SCH10S SCH40S SCH80S
Steel Stub End Standard:ANSI B 16.9 MSS SP44 DIN/JIS/GOST
Type:ELBOW 90ºLR SR 45ºLR EQUAL TEE REDUCING TEE,CROSS,CON REDUCER ECC,REDUCER CAPS STUB ENDS
CS lap joint stub ends Finishing:Black paint,vanish paint anti-rust oil
Connection:Butt welded ends
Picture of Steel Stub End
Package of Steel Stub End
Related Keywords