Corediam Tools Co., Ltd.
Corediam Tools Co., Ltd.
Laser Welded Segmented Concrete Blade
  • Laser Welded Segmented Concrete Blade
Laser Welded Segmented Concrete Blade

Laser Welded Segmented Concrete Blade

Payment Type:
L/C, T/T, D/P, Western Union
Incoterm:
FOB, CFR
Min. Order:
30 Piece/Pieces
Min. Order:
30 Piece/Pieces
Delivery Time:
15 Days
Transportation:
Ocean, Land, Air
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: CHINA
Productivity: 2000 pieces per month
Supply Ability: 5000 pcs per month
Payment Type: L/C,T/T,D/P,Western Union
Incoterm: FOB,CFR
Certificate: EN13236
HS Code: 82023910
Transportation: Ocean,Land,Air
Product Description
Product Description

Laser welded segmented concrete saw blade


Segmented concrete blades are laser welded, in this case, we have made the diamond blades have high strength and also improve its cutting performance. In order to reduce the stress to the steel core and prevent steel core cracking during cutting some hard materials, we have made undercut segments on the segments to protect the steel cores. They are installed on handheld saw, floor saw, walk-behind saw, using for dry or wet cutting concrete, cured concrete, green concrete reinforced concrete cutting. Laser welded concrete blades have good cutting performance, fast cutting speed, and long life. We can also supply granite blade, marble blade, tuck point blade, and wall saw blade etc.


Sizes 


Item No. Diameter Segment Height Segment Width Arbor
CCLB30010 300mm 10mm 3.2mm 20/25.4mm
CCLB35010 350mm 10mm 3.2mm 25.4mm
CCLB40010 400mm 10mm 3.2mm 25.4mm
CCLB45010 450mm 10mm 3.6mm 25.4mm
CCLB50010 500mm 10mm 3.6mm 25.4mm
CCLB55010 550mm 10mm 3.6mm 25.4mm
CCLB60010 600mm 10mm 4.5mm 25.4mm

Package

Every diamond saw blade will be packed by separated paper box.  5 or 10 pieces per carton.


Production capacity

We have full line diamond blades production line, the capacity can reach up to 500 pieces per week


Delivery time

Delivery time will be about two weeks when payment confirmed, in common case.


Payment terms

As our payment policy, we can work with 30% in advance, and pay 70% balance before delivery.

Other T/T, L/C, O/A  acceptable


OEM available.

Send your message to this supplier

  • Mr. Michael Tian

  • Enter between 20 to 4,000 characters.