Xinle Hongtai Waterproof Machinery Factory
Xinle Hongtai Waterproof Machinery Factory
Bitumen Production Line/SBS Waterproof Membrane Machine
  • Bitumen Production Line/SBS Waterproof Membrane Machine
Bitumen Production Line/SBS Waterproof Membrane Machine

Bitumen Production Line/SBS Waterproof Membrane Machine

Payment Type:
L/C, T/T
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Payment Type: L/C,T/T
Product Description
Product Description
Model HT-8000,HT-6000 Place of Origin Hebei, China (Mainland) Product name SBS/APP bitumen waterproof membrane Voltage 380v/50HZ Warranty 12 Months Length 50-60m Power 220KW Capacity 3000-15000square meter/day Capacity 3million-10million square meter/year Speed 5-50m/min Main Workshop 60m*12m*8m Automation degree Semi-automatic and Full-automatic Modified Materials SBS/APP Stander EN ISO 12100-2010 Compressed air 0.7Mpa,0.6 M3/min Surface material PE film, Aluminum foil,Sand, Schist flake,etc Fuel Coal,natural gas,diesel oil,etc Labor 5-10 Control system PLC Application: roof,subway,basement,wall,pool,cold storage, airportrunway, viaduct,etc Supply Ability 1set per month Price USD100,000-800,000 Min. Order 1set Packing:every part is carefully packed to avoid damaging during transportation. Delivery 90 days upon receiving order Modified bitumen waterproofing membrane is widely used in industrial and civil buildings, such as roof, basement, toilet, bridge, park, swimming pool, tunnel for waterproof and moisturepr of. Bitumen is a hydrocarbon and is created naturally from crude oil. It is a useful carbon store and does not generate greenhouse gases. The membrane is therefore a sustainable way of storing carbon on the Earth's surface. Working principle The whole working principle can be divided into 3 steps. 1.To mix the bitumen,rubber powder , talcum powder , enginee oil and some other raw materials via mixing tanks(the mixing tank should be kept warm by conduction oil).The finished mixtures can be called bituminous mixtures . 2.The bituminous mixtures will be delivered into coating pools.Then the base material(reinforcement ) will be coated with the bituminous mixtures.At last ,the coated reinforcement will be covered by PE film or sand or other materials.At that time ,the bitumen membrane preliminary forming. 3.The finished products will be cooled by water and air,then be rolled by auto winder. Capacity(M²/year)(Reference) 2 million 3 million 5 million 8 million 10 million Speed(M/min)(Reference) 0-12 0-18 0-25 0-30 0-35 Linear velocity 5-50M/min (adjustable) Power source 220KW,380V,50HZ,3P Labor Required(Reference) 5-7 6-9 9-11 9-11 9-11 Water Consumption 0.5T/day,recycling Main Workshop (L*W*H) /m 60x (12-15)x(6-8) 60x (12-15)x(6-8) 60x (12-15)x(6-8) 60x (12-15)x(6-8) 90x (12-15)x(6-8) Automation degree Semi-automatic and Full-automatic Fuel Coal, natural gas, diesel oil, etc Length/Roll 10m or as customized Width/Roll 1m-1.5m Thickness/Roll 1.5 mm-5mm Reinforcement Polyester, Fiberglass mat, Compound Mat Surface material PE film, Aluminum foil,Sand, Schist flake,etc Modified Materials SBS/APP Reinforcement(Base material) Polyester felt:140-300g/M², Fiberglass felt:150-250 g/M², Composite reinforcement(5×5-8×8) Diesel consumption 60Kg/h, Thermal efficiency≥73%, Oil burning boiler which is of 500,000K to heat conduction oil. Compressed air 0.7Mpa,0.6m³/min Air compressor motor 15KW

Send your message to this supplier

  • Mr. Hou fengxian

  • Enter between 20 to 4,000 characters.