
Desulfurization slurry pump for power plant
- Payment Type:
- L/C, T/T, D/P
- Incoterm:
- FOB, CFR, CIF
- Min. Order:
- 1 Set/Sets
- Min. Order:
- 1 Set/Sets
- Delivery Time:
- 30 Days
- Transportation:
- Ocean, Land
- Port:
- Xingang, Qingdao, Shanghai
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | Shijiazhuang,China |
---|---|
Payment Type: | L/C,T/T,D/P |
Incoterm: | FOB,CFR,CIF |
Certificate: | GB/T 19001-2008 idt ISO9001:2008 |
Transportation: | Ocean,Land |
Port: | Xingang,Qingdao,Shanghai |
Desulfurization Slurry Pump for Power Plant
According to the diameter of discharge, the KWP pump is from 40mm to 500mm.
Quantity range: 10~3500CBM/h.
Head range: 5~90m.
These are the frequently used metal material combination for KWP non-clogging pump. According to the different medium delivered by the pump, the pump head could be made of different materials, such as A49,2205, 2605N, 316L, ZG2Cr13, HT250.
Reliable rotor structure:
KWP series products are equipped with the heavy-duty designed bearing based on Germany standard, so the bearing could support more load; Oil lubrication type ensures a smooth and reliable operation, and normally, the service life of such bearing could be over 30,000 hours.
Series KWP high-efficiency FGD pump is a new generation energy saving pump.The KWP pump is single-stage, centrifugal pump which specially used for FGD, environment protection, chemicals, and the paper, sugar and caned food industries. It has the features of high efficiency, non-clogging and back pull out design which can allow the rotor to be removed from the pump casing without disturbing the piping or dismantling the casing. It simplifies maintenance also allows fast inter change of the impellers and wear plate of suction side, thereby allow the pump to be rapidly modified to suit for different operating conditions.
This type pump can deliver all kinds of sewage, clear water, seawater, bittern water, waste water and sludge so that it can be used in water supply plant, sewage treatment works, brewery.
FAQ:
Q: How about payment terms?
A: 30% TT deposit + 70% TT before shipment,50% TT deposit + 50% LC balance, Flexible payment
can be negotiated.
Q: Installation and commissioning?
A: We will send our engineer for installation and commissioning, but relevant cost will be paid by you.
Q: Do you have some videos where we can see the line producing?
A: Yes, we can provide some videos for reference.
Related Keywords