
220KV Fiberglass Insulation Scaffold/Scaffolding with 6M
- Payment Type:
- T/T, Western Union
- Incoterm:
- FOB, CFR, CIF, EXW
- Min. Order:
- 20 Piece/Pieces
- Min. Order:
- 20 Piece/Pieces
- Delivery Time:
- 10 Days
- Transportation:
- Ocean, Land, Air
- Port:
- Xingang
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | China |
---|---|
Productivity: | 500pcs/month |
Supply Ability: | 500pcs/month |
Payment Type: | T/T,Western Union |
Incoterm: | FOB,CFR,CIF,EXW |
Certificate: | ISO9001 |
Transportation: | Ocean,Land,Air |
Port: | Xingang |
Basic Information :
Product name: insulation quick loading scaffolding
Product execution standard: DL/T20100484 and JC/T20110983
Insulation quick installation maintenance frame is the latest production technology at home and abroad, according
to the field requirements developed from;The material is made of light and high-strength fiberglass tube, with no
metal structure, corrosion resistance, aging resistance, easy to use, high degree of safety, strong insulation
performance and other characteristics, which is mainly suitable for the special operation of substation maintenance
under 500KV, and is also an ideal substitute for the insulation lifting platform.
Specification :
Width x Length |
Width x Length |
||
0.85 x 1.8m 0.85 x 2.5m |
0.75m x 2.0m 0.75m x 2.5m |
||
Working Height (m) |
Platform Height (m) |
Working Height (m) |
Platform Height (m) |
4.1 |
2.1 |
4.34 |
2.34 |
4.6 |
2.6 |
4.81 |
2.81 |
5.1 |
3.1 |
5.27 |
3.27 |
6.1 |
4.1 |
5.73 |
3.73 |
6.6 |
4.6 |
6.20 |
4.20 |
7.1 |
5.1 |
6.66 |
4.66 |
7.6 |
5.6 |
7.13 |
5.13 |
8.2 |
6.2 |
7.59 |
5.59 |
8.7 |
6.7 |
8.05 |
6.05 |
9.2 |
7.2 |
8.52 |
6.52 |
10.2 |
8.2 |
8.89 |
6.89 |
10.7 |
8.7 |
9.45 |
7.45 |
11.2 |
9.2 |
9.91 |
7.91 |
11.7 |
9.7 |
10.37 |
8.37 |
12.2 |
10.2 |
10.84 |
8.84 |
12.7 |
10.7 |
11.30 |
9.30 |
13.2 |
11.2 |
11.77 |
9.77 |
13.7 |
11.7 |
12.23 |
10.23 |
Related Keywords